Plans and estimates

Before work starts, you may want to know what it may cost, and later compare that with what it did cost. An estimate is what a described piece of work may cost. Accepting one makes it the plan for its tag set. A plan is compared with cost and never stops spending.

Estimates

An estimate has a description, a tag set, and an amount as a probability distribution in dollars: the chance of each cost band, with its median. Any estimator makes one: the System 1 classifier from the description and the history of every tag value, or a person typing bands. Many estimates may exist for one tag set; each stays a record.

POST /api/v1/estimates
{
"work": "Refund checkout for a returns portal",
"tags": { "feature": "KD-1" },
"markup_percent": 15,
"context": "Last flow: 702.40 USD, sandbox timeouts"
}

work is the description. context is optional. The answer is the distribution with its median, in dollars; see the API. An estimate needs no tag: ask for one, keep it, and tag it later.

The hosted service runs the classifier, trained on the text of all organizations: summaries, estimate descriptions and the tags they got. It answers with probabilities only, so no description or client of another organization can come back out. A self-hosted instance points to an estimator of its own; see Configuration.

Accept

Anyone with plan on the filter accepts one estimate for a tag set, and that amount is the plan. Accepting another supersedes it; the earlier one stays a record, and a report as of an earlier date still shows it. Accept the median as it is or an estimate you typed; the plan is always an accepted estimate.

Plan of a filter over a date range the accepted estimate's amount, spread by days over the estimate's own date range, then cut to the report's range

An estimate for Shop of 750 over 100 days gives March (31 days) 232.50.

Shares

A share is (person, project, fraction, from, to). It says which part of a project's plan a person carries.

Plan of a person over a date range the sum over their shares of fraction × plan of that project over the days the share and the range both cover

Mara holds 0.6 of Shop from 1 March: her plan for March is 0.6 × 232.50 = 139.50. Shares over the people of a project may add up to more than 1; it is shown, never corrected. A handover is a new share for the new person; the old one ends.

Markup

A markup is an overhead percentage inside the estimate's amount. There is no separate line: an estimate of 500 with 15 percent markup is an estimate of 575.

Deviation

Plan minus cost, for any filter: a feature, a project, a person, a department. Positive is favourable. The classifier labels each one: scope, trouble, or the estimate itself. See Deviation and forecast.

No caps

A plan never stops an agent and sends no alert. Your provider offers spend caps if you need them.